Warehouse Overhead Crane
Warehouse Overhead Crane
BY Dongqi Crane IN Overhead Crane By Types
Warehouse Overhead Crane is a good choice for indoor lifting work. It has many different types, warehouse hook double girder overhead crane, warehouse European single girder overhead crane, warehouse grab double girder overhead crane, warehouse European single beam overhead crane, warehouse single girder low clearance Bridge Crane, warehouse trolley double girder overhead crane. Dongqi Group, one of China steel structure warehouse with crane suppliers, provides kinds of warehouse cranes with excellent quality! With compact structure, ideal price, great lifting capacity, Dongqi warehouse overhead crane is perfect solution for lifting work!
Top Warehouse Bridge Crane For Sale
- Lifting Capacity: 1-50t
- Span Length: 10.5-31.5m
- Lifting Height: 6-18m
- Working Class: A3,A4
- Ambient Temperature: -20-40℃
What are main parts of warehouse overhead crane?
Main parts include lifting hook, wire rope and brake. These three parts are very important, they are closely related to the safety. Once they have faults, the material will drop down easily and even leads accident.
Dongqi produces lifting hook with durable material! This kind of lifting hook has large loading capacity and long service life. In daily lifting work, workers should tie the goods on the hook tightly. This can protect hook and prevent the goods drop. Dongqi wire rope is also top quality and firm. It can load heavy tons and service for long time. Brake has stopping function. It can stop crane travelling and avoid accident.
Warehouse Overhead Crane For Sale
- Lifting Capacity: 1-50t
- Span Length: 10.5-31.5m
- Lifting Height: 6-18m
- Working Class: A3,A4
- Ambient Temperature: -20-40℃
How to ensure warehouse bridge crane safety?
First, make sure the decoupling device good condition. Avoiding collision when using the hook. Do regular lubrication, change the pulley timely when finding the crack, broken, serious weariness. Check the hook regularly, the hook defects can’t be dealt by repairing welding.
Second, avoiding the acute twist and turn when using wire rope. It is good to start, brake, accelerate and decelerate slowly. This can avoid wire rope broken because of powerful extension. When the crane works at the side of power line, it is necessary to keep enough safe distance. This can prevent the wire rope burned out once connecting with power line. When the wire rope touches with sharp corners of building and equipment, it is safe to add wood block. Wire rope should be arranged on the drum in order, not in mass, this can avoid much pressure and damage. Welding is forbidden besides wire rope, this can protect wire rope from high temperature arc and welding slag. If wire rope is too short, never adding another wire rope and extending the length by yourself. Lubricate and check the wire rope regularly.
Before work, check carefully whether the parts can work well, whether the brake clearance is suitable, whether brake surface is good, the adjusting nut is tight. Do the lubrication twice a week.
LEAVE YOUR INQUIRY
Overhead Crane Cases
Hot Blog
Contact Us
- Address: No.1, Weier Road, Henan (Changyuan) Crane Industry Park, China.
- Tel: +86-371-86687182
- Whatsapp: +86-15036177583
- Email: [email protected]
- Web: www.overhead-crane.org